Guilin Data Center AC Retrofit Project (July 2024)

scanning :

Shangufeng Energy-Saving Solutions: Revolutionizing Split AC Efficiency for Global Enterprise-Case Study: Guilin Data Center AC Retrofit Project (July 2024)

  • Project Overview

Shangufeng Technology implemented its innovative split AC optimization system at a mission-critical server facility in Guangxi, achieving:

- 29.8% energy reduction (71.47kWh → 50.17kWh over 21-hour test)

- Continuous 24/7 operation capability

- Extended equipment lifespan

- Real-time monitoring via 4G smart meters

2_20250522_17478951565989720

  • Global Significance for Industrial Applications

Our solution addresses universal challenges in:

✓ Data center cooling optimization

✓ 24/7 operational facilities

✓ Energy-intensive commercial buildings

✓ Compliance with international carbon neutrality initiatives

1_20250522_17478952091933040

  • Six-Core Value Proposition

1. Environmental Impact

- Reduces heat exhaust emissions

- Mitigates urban heat island effect

- Lowers carbon footprint (aligned with Paris Agreement)

 

2. Policy Alignment

- Supports China's 30·60 Dual Carbon Goals

- Complies with global net-zero commitments

- Advances UN SDG 7 (Affordable Clean Energy)

 

3. Technological Innovation

- Patented nano-composite materials

- Industry 4.0-ready solutions

- New productive forces applications

 

4. Economic Benefits

- 30%+ energy savings

- 2-8 month ROI period

- Reduced operational costs

 

5. Seamless Implementation

- Non-invasive retrofit (<1-3 units/hour)

- Zero structural modifications

- Maintenance-free operation

 

6. Health Advantages

- Nano-silver antimicrobial components

- Improved air quality

- Reduced "sick building" syndrome

  • Technical Specifications

- Compatible with all split AC systems

- Operates in -10°C to 50°C environments

- Real-time performance monitoring

- 30% average efficiency improvement

  • Global Applications

Ideal for:

• Data centers • Telecom facilities • Commercial buildings • Industrial plants

 

Implementation Timeline

1. Energy audit (1-2 days)

2. Installation (1 day per 20 units)

3. Performance verification (24-48h)

4. Ongoing optimization

  • Why Choose Shangufeng?

✔ Proven results in mission-critical environments

✔ Fastest ROI in the industry

✔ No disruption to operations

✔ Future-proof technology

 

Next Steps for Global Partners

Request:

✓ Facility assessment

✓ Customized savings projection

✓ Pilot program proposal

 

Transforming AC efficiency worldwide through materials science innovation