Energy Retrofit Project at Railway Group

scanning :

Energy Retrofit Project at Railway Group  

 

Project Overview  

Shan Gu Feng. continues to pioneer sustainable solutions for commercial infrastructure. On June 5, 2025, our project team led by Senior Project Manager Zhou Wei conducted an on-site performance test at Railway Group’s  Building Apartment. This retrofit project utilized our proprietary high-efficiency insulation materials to optimize HVAC energy consumption.  

 

 Project Documentation  

1. Site Assessment  

1_20250616_17500424829558960

   Caption: Pre-retrofit building assessment and material deployment planning.  

 

2. Retrofit Implementation  

  4_20250616_17500424829553860

   Caption: Installation of Shan Gu Feng Energy saving device.  

  5

   Caption: Precision installation ensures seamless integration with existing structures.  

 

3. Post-Retrofit Validation  

6

   Caption: Final inspection and sensor calibration for performance verification.  

 

 Performance Test Report  

Objective  

Quantify energy savings achieved through Shan Gu Feng’s retrofit solution under standardized operating conditions.  

 

Testing Protocol  

| Parameter        | Setting              |  

|------------------|----------------------|  

| Ambient Temp     | 22°C (71.6°F)       |  

| HVAC Fan Speed   | High                |  

| Operational Mode | Cooling             |  

| Duration         | 60 minutes          |  

| Monitoring       | Certified kWh Meter |  

 

Results  

| Phase            | Start (kWh) | End (kWh) | Consumption (kWh) |  

|------------------|-------------|-----------|-------------------|  

| Pre-Retrofit | 0.817       | 1.631     | 0.814             |  

| Post-Retrofit| 0.745       | 1.314     | 0.569             |  

 

Key Metric  

> ✅ 30.1% Reduction in Energy Consumption  

> (Calculated: (0.814 - 0.569) / 0.814 × 100%)  

 

 Technical Advantages  

Shan Gu Feng’s solution delivers:  

  • 30.1% Average Energy Savings for HVAC systems  

  • Non-Invasive Installation – Zero structural modifications  

  • ISO 14001-Certified Materials – Eco-safe & durable  

  • 5-Year Performance Guarantee  

 

 Why Partner With Shan Gu Feng?  

> "Our retrofit technologies cut operational costs while advancing corporate sustainability goals. This project demonstrates scalable solutions for railway networks, commercial properties, and public infrastructure globally."  

> — Zhou Wei, Senior Project Manager  

 

Global Applications  

Ideal for:  

✓ Railway dormitories & stations  

✓ Government buildings  

✓ Hospitality complexes  

✓ Cold-chain logistics centers